ZLP630 Platform for Painting and Window Cleaning is the exact configuration covered on this page. Confirm the complete system against the rated load, electrical supply and site conditions.

ZLP630 painting platform for exterior coating, window cleaning and facade maintenance. The final configuration must be verified against the working load, building geometry and destination power supply.


Working Principle:

The platform is driven by electric hoist and wire rope, running against the building facade while the suspension mechanism was erected on buildings or structures.

Usage and Application:

Подвесная платформа серии ZLP относится к высотным рабочим строительным машинам, в основном используется для установки навесных стен, очистки фасадов или других работ, таких как штукатурка, облицовка шпоном, нанесение лакокрасочных покрытий, масляная краска или очистка и техническое обслуживание и т. д., также может использоваться для больших резервуаров, мостов, плотин и других строительных работ.

Above all, HUIYANG Platform can increase the efficiency greatly, with simple and flexible operation, easy transfer, convenient and practical, safe and reliable.

The Parameters of ZLP series Suspended Platform
      Type
ZLP500
ZLP630
ZLP800
1.   Rated Load
500kg
630kg
800kg
2.   Lifting speed
9.3m/min
9.3m/min
9.3m/min
3.   Lifting height
100m
100m
100m
4.   Hoist
LTD6.3
LTD6.3
ООО8.0
4.1 Voltage-3 Phase
380V(415V/220V)
380V(415V/220V)
380V(415V/220V)
4.2 Frequency
50Hz/60Hz
50Hz/60Hz
50Hz/60Hz
4.3 Power
1.5kwx2
1.5kwx2
1.8kwx2
5.   Safety Lock
ЛСГ20
ЛСГ20
LSG30
6.   Electric Control
      Cabinet Components
Schneider or CHNT
Schneider or CHNT
Schneider or CHNT
7.   Platform Sise (LxWxH)
(2.5+2.5)x0.69×1.42m
(2+2+2)x0.69×1.42m
(2.5+2.5+2.5)x0.69×1.42m
8.   Steel Wire Rope
4pcsx100m
4x31SW+FC D=8.3mm
4pcsx100m
4x31SW+FC D=8.3mm
4pcsx100m
4x31SW+FC D=9.1mm
9.   Special Cable
(3×2.0+2×1.0mm2)  100m
(3×2.0+2×1.0mm2 ) 100m
(3×2.5+2×1.5mm2)  100m
10. Suspended Jibs
340kg
340kg
340kg
Lifting  Parts Weight
410kg(Steel)
290kg(Aluminum)
480kg(Steel)
340kg(Aluminum)
530kg(Steel)
380kg(Aluminum)
Counter Weight
750kg
900kg
1000kg
Qty of 20″ Container
13 sets
13 sets
10 sets

1. Working Platform: Steel + Painting; ( Steel+Galvanised or Aluminum Alloy+Painting is available also)

1.1 Working Platform is the workplace at heights for the workers.
1.2 Size of platform can be adjusted from 1.0m, 1.5m, 2m, 2.5 meter or 3m etc depending upon the needs of your building
1.3 With caster wheel fitted underneath, the platform is easy to move.

2. Suspension Mechanism: Surface with Painting or Hot-dipped Galvanized
Suspension mechanism is on the top of the building to suspend the platforms through the steel rope.

3. Components:
LTD6.3 Hoist, 1.5kw, 2 sets;
LSG20 Safety Lock, 2 sets;
Electric Cabine: 1 set;
Steel Rope: 4pcs, 100m/pcs; D=8.3mm;
Electric Cable: 1pcs, 100m/pcs, Rubber, 3×2.0+2×1.0mm sq;
Safety Rope: 1pcs; 100m/pcs; Nylon;
Counterweight (Optional): 40pcs, 25kg/pcs.

Configuration and Ordering Notes

Confirm platform length, material, hoist model, safety locks, wire ropes, controls and suspension mechanism as a complete approved system. Include workers, tools and materials in the load calculation.

  • Building height and facade dimensions
  • Required load and platform arrangement
  • Voltage, phase and frequency
  • Roof and parapet conditions

Compare suspended platform products, review replacement components, or request project selection support.

For site planning, also review the applicable local rules and the OSHA suspended scaffold requirements.