ZLP630 Platform for Painting and Window Cleaning
ZLP630 Platform for Painting and Window Cleaning is the exact configuration covered on this page. Confirm the complete system against the rated load, electrical supply and site conditions.
ZLP630 painting platform for exterior coating, window cleaning and facade maintenance. The final configuration must be verified against the working load, building geometry and destination power supply.
Working Principle:
The platform is driven by electric hoist and wire rope, running against the building facade while the suspension mechanism was erected on buildings or structures.
Usage and Application:
ZLP series Suspended Platform belongs to high-rise working construction machinery, mainly used to install curtain wall, facade cleaning or other works such as plaster pulp, veneer, paint coatings, oil paint, or cleaning and maintenance, etc., can also be used for large tanks, bridges, dams and other construction operations.
Above all, HUIYANG Platform can increase the efficiency greatly, with simple and flexible operation, easy transfer, convenient and practical, safe and reliable.
The Parameters of ZLP series Suspended Platform | |||
Type | ZLP500 | ZLP630 | ZLP800 |
1. Rated Load | 500kg | 630kg | 800kg |
2. Lifting speed | 9.3m/min | 9.3m/min | 9.3m/min |
3. Lifting height | 100m | 100m | 100m |
4. Hoist | LTD6.3 | LTD6.3 | LTD8.0 |
4.1 Voltage-3 Phase | 380V(415V/220V) | 380V(415V/220V) | 380V(415V/220V) |
4.2 Frequency | 50Hz/60Hz | 50Hz/60Hz | 50Hz/60Hz |
4.3 Power | 1.5kwx2 | 1.5kwx2 | 1.8kwx2 |
5. Safety Lock | LSG20 | LSG20 | LSG30 |
6. Electric Control Cabinet Components | Schneider or CHNT | Schneider or CHNT | Schneider or CHNT |
7. Platform Sise (LxWxH) | (2.5+2.5)x0.69×1.42m | (2+2+2)x0.69×1.42m | (2.5+2.5+2.5)x0.69×1.42m |
8. Steel Wire Rope | 4pcsx100m 4x31SW+FC D=8.3mm | 4pcsx100m 4x31SW+FC D=8.3mm | 4pcsx100m 4x31SW+FC D=9.1mm |
9. Special Cable | (3×2.0+2×1.0mm2) 100m | (3×2.0+2×1.0mm2 ) 100m | (3×2.5+2×1.5mm2) 100m |
10. Suspended Jibs | 340kg | 340kg | 340kg |
Lifting Parts Weight | 410kg(Steel) 290kg(Aluminum) | 480kg(Steel) 340kg(Aluminum) | 530kg(Steel) 380kg(Aluminum) |
Counter Weight | 750kg | 900kg | 1000kg |
Qty of 20″ Container | 13 sets | 13 sets | 10 sets |
1. Working Platform: Steel + Painting; ( Steel+Galvanised or Aluminum Alloy+Painting is available also)
1.1 Working Platform is the workplace at heights for the workers.
1.2 Size of platform can be adjusted from 1.0m, 1.5m, 2m, 2.5 meter or 3m etc depending upon the needs of your building
1.3 With caster wheel fitted underneath, the platform is easy to move.
2. Suspension Mechanism: Surface with Painting or Hot-dipped Galvanized
Suspension mechanism is on the top of the building to suspend the platforms through the steel rope.
3. Components:
LTD6.3 Hoist, 1.5kw, 2 sets;
LSG20 Safety Lock, 2 sets;
Electric Cabine: 1 set;
Steel Rope: 4pcs, 100m/pcs; D=8.3mm;
Electric Cable: 1pcs, 100m/pcs, Rubber, 3×2.0+2×1.0mm sq;
Safety Rope: 1pcs; 100m/pcs; Nylon;
Counterweight (Optional): 40pcs, 25kg/pcs.
Configuration and Ordering Notes
Confirm platform length, material, hoist model, safety locks, wire ropes, controls and suspension mechanism as a complete approved system. Include workers, tools and materials in the load calculation.
- Building height and facade dimensions
- Required load and platform arrangement
- Voltage, phase and frequency
- Roof and parapet conditions
Compare suspended platform products, review replacement components, or request project selection support.
For site planning, also review the applicable local rules and the OSHA suspended scaffold requirements.


Previous Post
Next Post