
Powder-Coated ZLP630 ZLP800 and ZLP1000 Platforms
Powder-Coated ZLP630 ZLP800 and ZLP1000 Platforms is the exact configuration covered on this page. Confirm the complete system against the rated load, electrical supply and site conditions.
Powder-coated ZLP platform range covering ZLP630, ZLP800 and ZLP1000 systems. The final configuration must be verified against the working load, building geometry and destination power supply.
Suspended platform consists if suspension mechanism,hoist,safety lock,electric control box and platform.They have resonable structure and they are easy to operate.According to the actual needs,they are arbitrarily assembled and disassembled.Suspended platfrom applies to exterior wall construction,decoration,cleaning and maintance of high-rise buildings.
There are 5 – 10 People R&D Engineer(s) in our company. R & D is the company’s core departments, shoulder research and development of new products, improve product features task. Workflow R & D center is based on the CMM model trimmed, divided into specific planning, design, implementation, testing and maintenance of five steps. At the end of the planning, design stage, carry out periodic checks at the implementation stage will be three testing and acceptance testing andinspection after each has a separate version that can be run, followed by the test phase; test code coverage, test data coverage When finished, enter the maintenance phase, including products, services and upgrades to further improve customer service, and establish the company’s brand.
Anything need our assisstant feel free to contact us. Email: [email protected]
Configuration and Ordering Notes
Confirm platform length, material, hoist model, safety locks, wire ropes, controls and suspension mechanism as a complete approved system. Include workers, tools and materials in the load calculation.
- Building height and facade dimensions
- Required load and platform arrangement
- Voltage, phase and frequency
- Roof and parapet conditions
Compare suspended platform products, review replacement components, or request project selection support.
For site planning, also review the applicable local rules and the OSHA suspended scaffold requirements.


Previous Post
Next Post