{"id":1027,"date":"2018-09-26T01:56:27","date_gmt":"2018-09-26T01:56:27","guid":{"rendered":"http:\/\/www.buildinglift.com\/?p=1027"},"modified":"2018-09-27T09:06:12","modified_gmt":"2018-09-27T09:06:12","slug":"2-5m-x-3-sektioner-stallnings-arbetstid-plattformar-800kg-aluminium-med-sakerhet-las-30-kn","status":"publish","type":"post","link":"https:\/\/www.buildinglift.com\/sv\/2-5m-x-3-sektioner-stallnings-arbetstid-plattformar-800kg-aluminium-med-sakerhet-las-30-kn\/","title":{"rendered":"2.5m x 3 sections scaffold working platforms 800kg aluminum with safety lock 30KN"},"content":{"rendered":"<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-1028\" src=\"http:\/\/www.buildinglift.com\/wp-content\/uploads\/2.5m-x-3-sections-scaffold-working-platforms-800kg-aluminum-with-safety-lock-30KN.jpg\" alt=\"2.5m x 3 sections scaffold working platforms 800kg aluminum with safety lock 30KN\" width=\"600\" height=\"485\" srcset=\"https:\/\/www.buildinglift.com\/wp-content\/uploads\/2.5m-x-3-sections-scaffold-working-platforms-800kg-aluminum-with-safety-lock-30KN.jpg 600w, https:\/\/www.buildinglift.com\/wp-content\/uploads\/2.5m-x-3-sections-scaffold-working-platforms-800kg-aluminum-with-safety-lock-30KN-300x243.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/p>\n<h3>Descriptions<\/h3>\n<hr \/>\n<p>Anv\u00e4ndningsomr\u00e5den:<\/p>\n<p>1. Reng\u00f6ring och underh\u00e5ll av ytterv\u00e4ggen p\u00e5 h\u00f6ghus.<\/p>\n<p>2. M\u00e5lning, dekoration och renovering av ytterv\u00e4ggar.<\/p>\n<p>3. Installationsprojekt och andra byggnadsarbeten f\u00f6r ytterv\u00e4ggar i h\u00f6ghus.<\/p>\n<p>4. Flygarbete med fartyg, stora torn, broar, dammar och stora skorstenar.<\/p>\n<p>5. Installera och underh\u00e5lla hissschakt i h\u00f6ghus, varvsindustrin, sj\u00f6g\u00e5ende fartyg, krigsfartyg och svetsning.<\/p>\n<h3>Technical Parameter<\/h3>\n<hr \/>\n<table border=\"1\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td colspan=\"2\">Modellnr.<\/td>\n<td>ZLP800<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Nominell belastning (kg)<\/td>\n<td>800<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Lyfthastighet (m\/min)<\/td>\n<td>8\uff5e10<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Motoreffekt (kw)<\/td>\n<td>2\u00d71,8 50Hz\/60Hz<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Bromsvridmoment (km)<\/td>\n<td>16<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Justeringsomr\u00e5de f\u00f6r st\u00e5lvajervinkel (\u00b0)<\/td>\n<td>3\u00b0\u20138\u00b0<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Avst\u00e5nd mellan tv\u00e5 st\u00e5llinor (mm)<\/td>\n<td>\u2264100<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Nominell str\u00e4ckning av frambalk (mm)<\/td>\n<td>1500<\/td>\n<\/tr>\n<tr>\n<td>Upph\u00e4ngningsplattform<\/td>\n<td>L\u00e5sning<\/td>\n<td>Aluminiumlegering<\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td>Antal plattformsst\u00e4ll<\/td>\n<td>Enkelst\u00e4ll<\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td>Antal plattformar<\/td>\n<td>3<\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td>L\u00d7B\u00d7H(mm)<\/td>\n<td>(2500\u00d73)\u00d7690\u00d71180<\/td>\n<\/tr>\n<tr>\n<td><\/td>\n<td>Vikt (kg)<\/td>\n<td>410 kg<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Upph\u00e4ngningsmekanism (kg)<\/td>\n<td>2\u00d7175 kg<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Motvikt (kg) valfritt<\/td>\n<td>25\u00d740 st<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Diameter av st\u00e5lvapen (mm)<\/td>\n<td>8.6<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Max lyfth\u00f6jd (m)<\/td>\n<td>300<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Motorns rotationshastighet (r\/min)<\/td>\n<td>1420<\/td>\n<\/tr>\n<tr>\n<td colspan=\"2\">Voltage(v) 3PHASES<\/td>\n<td>220V\/380V\/415V (customized)<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Competitive advantages<\/h3>\n<hr \/>\n<p>1. Absolut garantera livss\u00e4kerhet under flygarbete<\/p>\n<p>Safety lock fasten the steel rope immediately once the suspended platform tilts or the steel rope slips out of the hoist;<\/p>\n<p>Electric control system is designed with leakage protection, over-heat protection, current overload protection and brake stop;<\/p>\n<p>St\u00e5lvajer, s\u00e4kerhetslina och vajer av god kvalitet.<\/p>\n<p>2. Stabil prestanda: h\u00f6j och s\u00e4nk ner smidigt<\/p>\n<p>3. Modul\u00e4r design. L\u00e4tt att demontera, montera, anv\u00e4nda och underh\u00e5lla.<\/p>\n<p>4. Lyfth\u00f6jden kan justeras efter behov (max 300 meter)<\/p>\n<p>5. Arbetssp\u00e4nning och frekvens kan justeras (220V\/380V\/415V etc.)<\/p>\n<p>6. Upph\u00e4ngd plattform f\u00f6r speciell anv\u00e4ndning kan anpassas (cirkul\u00e4r, L-formad, U-formad, etc.)<\/p>\n<p>7. Professionell kvalitet, konkurrenskraftigt pris, snabb leverans, bra service.<\/p>\n<p>8. Professional sales team with different language English, Spanish, Russian.<\/p>\n<h3>Detailed Product Description<\/h3>\n<hr \/>\n<p>Material: Steel \/ Aluminum Alloy<br \/>\nSuspension Mechanism: Painted \/ Hot Galvanized<br \/>\nMotor Power: 2 X 1.8kw, 50\/60Hz<br \/>\nLifting Speed: 8-10 M\/min<br \/>\nDiameter Of Steel Rope: 8.6mm \/ 9.1mm<br \/>\nCounter Weight: Concrete, Concrete With Steel Cover, Iron-casting<\/p>","protected":false},"excerpt":{"rendered":"<p>Descriptions Applications: 1. Cleaning and maintaining of the exterior wall of high-rise building. 2. Painting, decoration and refurbishing of exterior walls. 3. Installation projects and other construction working of outer walls of high-rise building. 4. Aerial working of ship, large tower, bridge, dams and large chimneys. 5. Install and maintain for high-rise building elevator hoistway, [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":1028,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[27,30,29],"class_list":["post-1027","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-suspended-working-platform","tag-steel-platform-construction","tag-suspended-scaffold-platform","tag-suspended-working-platform-safety"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/posts\/1027","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/comments?post=1027"}],"version-history":[{"count":0,"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/posts\/1027\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/media\/1028"}],"wp:attachment":[{"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/media?parent=1027"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/categories?post=1027"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildinglift.com\/sv\/wp-json\/wp\/v2\/tags?post=1027"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}