{"id":1204,"date":"2018-08-27T07:52:28","date_gmt":"2018-08-27T07:52:28","guid":{"rendered":"http:\/\/www.buildinglift.com\/?p=1204"},"modified":"2018-09-27T08:36:18","modified_gmt":"2018-09-27T08:36:18","slug":"dubbele-cabines-hijsbaar-lifting-opgehangen-platform","status":"publish","type":"post","link":"https:\/\/www.buildinglift.com\/nl\/dubbele-cabines-hijsbaar-lifting-opgehangen-platform\/","title":{"rendered":"Dubbele cabine hijsinstallatie voor het hijsen van een hangend platform"},"content":{"rendered":"<p><iframe src=\"https:\/\/www.youtube.com\/embed\/HBFEkZtG3kU?rel=0&amp;controls=0\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><\/p>\n<table>\n<tbody>\n<tr>\n<td>MODEL NUMBER<\/td>\n<td>ZLP630-016<\/td>\n<td>ZLP630<\/td>\n<td>ZLP500<\/td>\n<\/tr>\n<tr>\n<td>Rated Capacity(kg)<\/td>\n<td>800<\/td>\n<td>630<\/td>\n<td>500<\/td>\n<\/tr>\n<tr>\n<td>Lifting Speed(m\/min)<\/td>\n<td>8-10<\/td>\n<td>9-11<\/td>\n<td>9-11<\/td>\n<\/tr>\n<tr>\n<td>Rated Power(KW)<\/td>\n<td>2.2&#215;2<\/td>\n<td>1.5&#215;2<\/td>\n<td>1.1&#215;2<\/td>\n<\/tr>\n<tr>\n<td>Hoist Model<\/td>\n<td>LTD80<\/td>\n<td>LTD63<\/td>\n<td>LTD50<\/td>\n<\/tr>\n<tr>\n<td>Safety Lock Model<\/td>\n<td>LSA30<\/td>\n<td>LSA30<\/td>\n<td>LSA30<\/td>\n<\/tr>\n<tr>\n<td>Dimension of platform<\/p>\n<p>L\u00a0x\u00a0W x H(mm)<\/td>\n<td>7500x690x1230<\/td>\n<td>6000x690x1230<\/td>\n<td>5000x690x1230<\/td>\n<\/tr>\n<tr>\n<td>&nbsp;<\/p>\n<p>suspension mechanism<\/p>\n<p>&nbsp;<\/p>\n<p>weight(kg)<\/p>\n<p>&nbsp;<\/td>\n<td>350<\/td>\n<td>350<\/td>\n<td>350<\/td>\n<\/tr>\n<tr>\n<td>Counterweight(kg)<\/td>\n<td>1000<\/td>\n<td>800<\/td>\n<td>750<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Quick Details<\/h2>\n<hr \/>\n<p>Product name: Double cabin hoist lifting suspended platform<br \/>\nMaterial: Steel<br \/>\nCertificate: ISO9001\/CE<br \/>\nSurface Treatment: HDG<br \/>\nColor: Customized<br \/>\nType: Suspended Working Platform Equipment<br \/>\nApplication: Building Facade Cleaning<br \/>\nVoltage: 220V\/380v\/415V\/50hz<br \/>\nKeyword: High Altitude Working<br \/>\nName: Swing Stage<\/p>\n<h2>Normen voor het afdanken van belangrijke componenten<\/h2>\n<hr \/>\n<p>Hoofdbevestigingen van het ophangingsplatform: Wanneer het ophangingsmechanisme of het ophangingsplatform er als volgt uitziet, dient het te worden afgedankt.<\/p>\n<p>1. After the overall instability, it must not be repaired and must be scrapped.<\/p>\n<p>2. When permanent deformation is generated and cannot be repaired, it must be scrapped.<\/p>\n<p>3. When some components are permanently deformed and cannot be repaired and the surface corrosion or wear depth exceeds 10% of the original component, the corresponding components should be scrapped.<\/p>\n<p>4. When cracks occur in structural parts and welds, according to the stress situation and crack conditions, after repairing or taking reinforcement measures, the original design requirements can be met, and repairs must be taken to strengthen the measures before they can continue to be used. Otherwise, they should be scrapped.<\/p>","protected":false},"excerpt":{"rendered":"<p>MODEL NUMBER ZLP630-016 ZLP630 ZLP500 Rated Capacity(kg) 800 630 500 Lifting Speed(m\/min) 8-10 9-11 9-11 Rated Power(KW) 2.2&#215;2 1.5&#215;2 1.1&#215;2 Hoist Model LTD80 LTD63 LTD50 Safety Lock Model LSA30 LSA30 LSA30 Dimension of platform L\u00a0x\u00a0W x H(mm) 7500x690x1230 6000x690x1230 5000x690x1230 &nbsp; suspension mechanism &nbsp; weight(kg) &nbsp; 350 350 350 Counterweight(kg) 1000 800 750 Quick Details [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":1205,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[21],"tags":[],"class_list":["post-1204","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-suspended-platform-videos"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/posts\/1204","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/comments?post=1204"}],"version-history":[{"count":0,"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/posts\/1204\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/media\/1205"}],"wp:attachment":[{"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/media?parent=1204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/categories?post=1204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildinglift.com\/nl\/wp-json\/wp\/v2\/tags?post=1204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}