{"id":969,"date":"2018-09-26T00:43:20","date_gmt":"2018-09-26T00:43:20","guid":{"rendered":"http:\/\/www.buildinglift.com\/?p=969"},"modified":"2026-06-19T03:41:33","modified_gmt":"2026-06-19T11:41:33","slug":"personne-seule-suspension-travail-plate-forme-zlp100-tour-maintenance","status":"publish","type":"post","link":"https:\/\/www.buildinglift.com\/fr\/personne-seule-suspension-travail-plate-forme-zlp100-tour-maintenance\/","title":{"rendered":"Single-Person ZLP100 Platform for Tower Maintenance"},"content":{"rendered":"<h2>Single-Person ZLP100 Platform for Tower Maintenance<\/h2>\n<p>The <strong>single-person ZLP100 platform<\/strong> is a compact suspended cradle intended for individual inspection or maintenance tasks where the approved rated load and platform dimensions are suitable. It is not a substitute for a larger platform when tools and materials increase the total load.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-970\" src=\"https:\/\/www.buildinglift.com\/wp-content\/uploads\/Single-Person-Suspended-Working-Platform-ZLP100-For-Tower-Maintenance.jpg\" alt=\"Single Person Suspended Working Platform ZLP100 For Tower Maintenance\" width=\"600\" height=\"800\" srcset=\"https:\/\/www.buildinglift.com\/wp-content\/uploads\/Single-Person-Suspended-Working-Platform-ZLP100-For-Tower-Maintenance.jpg 600w, https:\/\/www.buildinglift.com\/wp-content\/uploads\/Single-Person-Suspended-Working-Platform-ZLP100-For-Tower-Maintenance-225x300.jpg 225w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/p>\n<h3>Description:<\/h3>\n<hr \/>\n<p>Quick Detail:<\/p>\n<p>1. Model No.: ZLP100<\/p>\n<p>2. Brand Name: HAOKE<\/p>\n<p>3. Material: Steel \/ Aluminum<\/p>\n<p>4. Appearance: Steel \/ Hot Galvanized \/ Aluminum<\/p>\n<p>5. Capacity Loading: 100 KG<\/p>\n<p>6. Lifting Height: Maximum 300 Mts<\/p>\n<p>7. Counterweight: Concrete, Concrete with steel cover, Iron<\/p>\n<h3>Applications:<\/h3>\n<hr \/>\n<p>1. Cleaning and maintaining of the exterior wall of high-rise building.<\/p>\n<p>2. Painting, decoration and refurbishing of exterior walls.<\/p>\n<p>3. Installation projects and other construction working of outer walls of high-rise building.<\/p>\n<p>4. Aerial working of ship, large tower, bridge, dams and large chimneys.<\/p>\n<p>5. Install and maintain for high-rise building elevator hoistway, shipbuilding industry, seagoing vessel, warships welding maintenance.<\/p>\n<h3>Technical Parameters:<\/h3>\n<hr \/>\n<p>Loading Capacity: 100kg<\/p>\n<p>Lifting Speed: 9.6m\/min<\/p>\n<p>Size: 1000 x 690 x 1300mm (L X W X H)<\/p>\n<p>Power: 1 x 1.5kw<\/p>\n<p>Brake Torque: 15Nm<\/p>\n<p>Steel rope angle adjusting range(\u00b0): 3\u00b0- 8\u00b0<\/p>\n<p>Distance between two steel rope(mm): \u2264100<\/p>\n<p>Rated stretch of front beam(mm): 1500mm<\/p>\n<p>Counterweight: 25kg x 30pcs<\/p>\n<p>Diameter of steel rope(mm): 8.3mm<\/p>\n<p>Max Lifting height(m): 300<\/p>\n<p>Motor rotation speed(r\/min): 1420<\/p>\n<p>Voltage: 380V\/220V\/415V, 50HZ\/60HZ, Single Phase \/ Three Phases<\/p>\n<h3>Competitive advantages:<\/h3>\n<hr \/>\n<p>1. Absolutely guarantee life safety during Aerial working<\/p>\n<p>Safety lock fasten the steel rope immediately once the suspended platform tilts or the steel rope slips out of the hoist;Electric control system is designed with leakage protection, over-heat protection, current overload protection and brake stop;<\/p>\n<p>Good-quality steel wire rope, safety rope and cable.<\/p>\n<p>2. Stable performance: raise up and lower down smoothly<\/p>\n<p>3. Modular design. Easy to disassemble, assemble operate and maintain.<\/p>\n<p>4. Lifting height can be adjusted according to requirement (Maximum 300 Meters)<\/p>\n<p>5. Working voltage and frequency can be adjusted (220V\/380V\/415V etc.)<\/p>\n<p>6. Suspended platform for special usage can be customized (circular, L shape, U shape, etc)<\/p>\n<p>7. Professional quality, competitive price, fast delivery, good services.<\/p>\n<h3>Detailed Product Description<\/h3>\n<hr \/>\n<p>Motor Power: 2 X 1.5kw, 50\/60Hz<br \/>\nMaterial: Steel \/ Aluminum Alloy<br \/>\nLifting Speed: 9.6 M\/min<br \/>\nDiameter Of Steel Rope: 8.3mm<br \/>\nAppearance: Steel \/ Hot Galvanized \/ Aluminum Alloy<br \/>\nMotor Rotation Speed: 1420 R\/min<\/p>\n<h2>Tower Maintenance Use<\/h2>\n<p>Tower geometry, wind exposure and rescue planning require particular attention. The route of travel should be clear of antennas, braces and projections, and the suspension point must be engineered for the actual structure.<\/p>\n<h2>Project Information Required<\/h2>\n<ul>\n<li>Building height, facade shape and required platform length<\/li>\n<li>Calculated working load, including workers, tools and materials<\/li>\n<li>Destination voltage, phase and frequency<\/li>\n<li>Roof parapet and suspension-beam conditions<\/li>\n<\/ul>\n<p>Browse the <a href=\"https:\/\/www.buildinglift.com\/product-category\/suspended-platform\/\">suspended platform range<\/a>, check compatible <a href=\"https:\/\/www.buildinglift.com\/suspended-platform-spare-parts-2\/\">platform components<\/a>, or <a href=\"https:\/\/www.buildinglift.com\/contact-us\/\">send the project specifications<\/a>. Installation and operation must follow the approved configuration and applicable <a href=\"https:\/\/www.hse.gov.uk\/work-equipment-machinery\/lift-persons.htm\" target=\"_blank\" rel=\"noopener\">guidance for lifting people<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Single-person ZLP100 platform for tower inspection and maintenance, with a compact 100 kg model-class cradle and controlled vertical access.<\/p>","protected":false},"author":1,"featured_media":970,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-969","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-suspended-working-platform"],"_links":{"self":[{"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/posts\/969","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/comments?post=969"}],"version-history":[{"count":1,"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/posts\/969\/revisions"}],"predecessor-version":[{"id":7025,"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/posts\/969\/revisions\/7025"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/media\/970"}],"wp:attachment":[{"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/media?parent=969"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/categories?post=969"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildinglift.com\/fr\/wp-json\/wp\/v2\/tags?post=969"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}