{"id":980,"date":"2018-09-26T00:52:20","date_gmt":"2018-09-26T00:52:20","guid":{"rendered":"http:\/\/www.buildinglift.com\/?p=980"},"modified":"2026-06-19T04:59:43","modified_gmt":"2026-06-19T12:59:43","slug":"1000-kg-7-5-mx-3-sections-alloy-alloy-suspend-working-platform-zlp1000","status":"publish","type":"post","link":"https:\/\/www.buildinglift.com\/es\/1000-kg-7-5-mx-3-sections-alloy-alloy-suspend-working-platform-zlp1000\/","title":{"rendered":"ZLP1000 Aluminum Working Platform: 7.5 m Cradle"},"content":{"rendered":"<h2>7.5 m ZLP1000 Aluminum Working Platform<\/h2>\n<p>The <strong>7.5 m ZLP1000 aluminum platform<\/strong> provides a broad working cradle for facade tasks requiring an approved higher-capacity configuration. Its three-section arrangement should be checked as a complete structure, including connectors and suspension-point spacing.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-981\" src=\"https:\/\/www.buildinglift.com\/wp-content\/uploads\/1000-kg-7.5-m-x-3-Sections-Aluminum-Alloy-Suspended-Working-Platform-ZLP1000.jpg\" alt=\"1000 kg 7.5 m x 3 Sections Aluminum Alloy Suspended Working Platform ZLP1000\" width=\"600\" height=\"340\" srcset=\"https:\/\/www.buildinglift.com\/wp-content\/uploads\/1000-kg-7.5-m-x-3-Sections-Aluminum-Alloy-Suspended-Working-Platform-ZLP1000.jpg 600w, https:\/\/www.buildinglift.com\/wp-content\/uploads\/1000-kg-7.5-m-x-3-Sections-Aluminum-Alloy-Suspended-Working-Platform-ZLP1000-300x170.jpg 300w\" sizes=\"(max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>Descriptions:<\/p>\n<h3>Applications:<\/h3>\n<hr \/>\n<p>1. Cleaning and maintaining of the exterior wall of high-rise building.<\/p>\n<p>2. Painting, decoration and refurbishing of exterior walls.<\/p>\n<p>3. Installation projects and other construction working of outer walls of high-rise building.<\/p>\n<p>4. Aerial working of ship, large tower, bridge, dams and large chimneys.<\/p>\n<p>5. Install and maintain for high-rise building elevator hoistway, shipbuilding industry, seagoing vessel,<\/p>\n<p>warships welding maintain.<\/p>\n<h3>Technical Parameter<\/h3>\n<hr \/>\n<table style=\"height: 568px;\" border=\"1\" width=\"663\" cellspacing=\"0\" cellpadding=\"0\">\n<tbody>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Property Model No.<\/td>\n<td style=\"width: 223.4px;\">ZLP1000<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Rated load(kg)<\/td>\n<td style=\"width: 223.4px;\">1000<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Lifting speed(m\/min)<\/td>\n<td style=\"width: 223.4px;\">8\uff5e10<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Motor power(kw)<\/td>\n<td style=\"width: 223.4px;\">2\u00d72.2 50HZ\/60HZ<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Brake torque(Km)<\/td>\n<td style=\"width: 223.4px;\">16<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Steel rope angle adjusting range(\u00b0)<\/td>\n<td style=\"width: 223.4px;\">3\u00b0- 8\u00b0<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Distance between two steel rope(mm)<\/td>\n<td style=\"width: 223.4px;\">\u2264100<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Rated stretch of front beam(mm)<\/td>\n<td style=\"width: 223.4px;\">1500<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 225.333px;\" rowspan=\"5\">Suspending platform<\/td>\n<td style=\"width: 206.267px;\">Locking<\/td>\n<td style=\"width: 223.4px;\">Aluminum alloy<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 206.267px;\">Nr.Of platform rack<\/td>\n<td style=\"width: 223.4px;\">Single rack<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 206.267px;\">Nr.Of platform<\/td>\n<td style=\"width: 223.4px;\">3<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 206.267px;\">L\u00d7W\u00d7H(mm)<\/td>\n<td style=\"width: 223.4px;\">(2500\u00d73)\u00d7690\u00d71300<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 206.267px;\">Weight(kg)<\/td>\n<td style=\"width: 223.4px;\">455 Kg<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Suspending mechanism(kg)<\/td>\n<td style=\"width: 223.4px;\">2\u00d7175 Kg<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Counterweight(kg) optional<\/td>\n<td style=\"width: 223.4px;\">25\u00d744pcs<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Diameter of steel rope(mm)<\/td>\n<td style=\"width: 223.4px;\">8.6 \/ 9.1<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Max Lifting height(m)<\/td>\n<td style=\"width: 223.4px;\">300<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Motor rotation speed(r\/min)<\/td>\n<td style=\"width: 223.4px;\">1420<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 433.6px;\" colspan=\"2\">Voltage(v) 3PHASES<\/td>\n<td style=\"width: 223.4px;\">220V\/380V\/<\/p>\n<p>415V<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img decoding=\"async\" class=\"alignnone size-full wp-image-982\" src=\"https:\/\/www.buildinglift.com\/wp-content\/uploads\/Main-Parts2.jpg\" alt=\"ZLP1000 Aluminum Working Platform: 7.5 m Cradle - image 2\" width=\"680\" height=\"320\" srcset=\"https:\/\/www.buildinglift.com\/wp-content\/uploads\/Main-Parts2.jpg 680w, https:\/\/www.buildinglift.com\/wp-content\/uploads\/Main-Parts2-600x282.jpg 600w, https:\/\/www.buildinglift.com\/wp-content\/uploads\/Main-Parts2-300x141.jpg 300w\" sizes=\"(max-width: 680px) 100vw, 680px\" \/><\/p>\n<h3>Detailed Product Description<\/h3>\n<hr \/>\n<p>Material: Aluminum Alloy<br \/>\nColor: Silver<br \/>\nVoltage: 380V\/415V\/440V\/220V, 50\/60Hz (can Be Customized)<br \/>\nHoist Power: 2.2kw<br \/>\nLifting Height: 300 Mts (Max.)<br \/>\nDiameter Of Steel Rope: 9.1mm<\/p>\n<h2>7.5 m Platform Planning<\/h2>\n<p>A longer platform changes load distribution and handling during assembly. Confirm the permissible worker positions, carried materials and roof suspension spacing for the exact system supplied.<\/p>\n<h2>Project Information Required<\/h2>\n<ul>\n<li>Building height, facade shape and required platform length<\/li>\n<li>Calculated working load, including workers, tools and materials<\/li>\n<li>Destination voltage, phase and frequency<\/li>\n<li>Roof parapet and suspension-beam conditions<\/li>\n<\/ul>\n<p>Browse the <a href=\"https:\/\/www.buildinglift.com\/product-category\/suspended-platform\/\">suspended platform range<\/a>, check compatible <a href=\"https:\/\/www.buildinglift.com\/suspended-platform-spare-parts-2\/\">platform components<\/a>, or <a href=\"https:\/\/www.buildinglift.com\/contact-us\/\">send the project specifications<\/a>. Installation and operation must follow the approved configuration and applicable <a href=\"https:\/\/www.hse.gov.uk\/work-equipment-machinery\/lift-persons.htm\" target=\"_blank\" rel=\"noopener\">guidance for lifting people<\/a>.<\/p>\n<h2>ZLP1000 aluminum working platform Selection Notes<\/h2>\n<p>The stated platform length is a project configuration, while the focus remains on matching the complete ZLP1000 aluminum working platform to the required load, electrical supply and suspension conditions. Section joints, hoist mountings and rope paths should be inspected as part of the assembled system.<\/p>","protected":false},"excerpt":{"rendered":"<p>ZLP1000 aluminum working platform with a 7.5 m three-section cradle for higher-capacity facade construction, painting and maintenance.<\/p>","protected":false},"author":1,"featured_media":981,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[27],"class_list":["post-980","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-suspended-working-platform","tag-steel-platform-construction"],"_links":{"self":[{"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/posts\/980","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/comments?post=980"}],"version-history":[{"count":3,"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/posts\/980\/revisions"}],"predecessor-version":[{"id":7290,"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/posts\/980\/revisions\/7290"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/media\/981"}],"wp:attachment":[{"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/media?parent=980"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/categories?post=980"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildinglift.com\/es\/wp-json\/wp\/v2\/tags?post=980"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}