{"id":790,"date":"2018-09-25T04:18:04","date_gmt":"2018-09-25T04:18:04","guid":{"rendered":"http:\/\/www.buildinglift.com\/?p=790"},"modified":"2026-06-19T04:51:56","modified_gmt":"2026-06-19T12:51:56","slug":"%d8%b9%d9%84%d9%82%d8%aa-%d9%85%d8%b1%d8%ba%d9%88%d8%a8-%d8%b1%d9%81%d8%b9-%d8%b1%d9%81%d8%b9-%d8%b3%d9%84%d8%a9","status":"publish","type":"post","link":"https:\/\/www.buildinglift.com\/ar\/%d8%b9%d9%84%d9%82%d8%aa-%d9%85%d8%b1%d8%ba%d9%88%d8%a8-%d8%b1%d9%81%d8%b9-%d8%b1%d9%81%d8%b9-%d8%b3%d9%84%d8%a9\/","title":{"rendered":"Custom Suspended Platform Lifting Hoist"},"content":{"rendered":"<h2>Custom Suspended Platform Lifting Hoist<\/h2>\n<p><strong>Custom Suspended Platform Lifting Hoist<\/strong> is the exact configuration covered on this page. Confirm the complete system against the rated load, electrical supply and site conditions.<\/p>\n<p>A <strong>custom suspended platform hoist<\/strong> can address verified non-standard electrical or mounting requirements. Customization must preserve rope, brake and safety-system compatibility.<\/p>\n<p><img fetchpriority=\"high\" decoding=\"async\" class=\"alignnone size-full wp-image-792\" src=\"https:\/\/www.buildinglift.com\/wp-content\/uploads\/Suspended-Platform-Electric-Motor-Lifting-Hoist.jpg\" alt=\"\u0631\u0627\u0641\u0639\u0629 \u0631\u0641\u0639 \u0628\u0645\u062d\u0631\u0643 \u0643\u0647\u0631\u0628\u0627\u0626\u064a \u0645\u0646\u0635\u0629 \u0645\u0639\u0644\u0642\u0629\" width=\"500\" height=\"432\" srcset=\"https:\/\/www.buildinglift.com\/wp-content\/uploads\/Suspended-Platform-Electric-Motor-Lifting-Hoist.jpg 500w, https:\/\/www.buildinglift.com\/wp-content\/uploads\/Suspended-Platform-Electric-Motor-Lifting-Hoist-300x259.jpg 300w\" sizes=\"(max-width: 500px) 100vw, 500px\" \/><\/p>\n<h3>Product Description<\/h3>\n<hr \/>\n<p>Hoist, as the key part of suspended platform, is the power mechanism of the working platform.<\/p>\n<p>The hoist adopts electromagnetic brake three-phase asynchronous motor driving, drives the wire rope conveying mechanism after the deceleration of the worm gear and a pair of engaging gears. The wire rope conveying mechanism is mainly composed of a pair of driving wheel and the grooved internal gear.<\/p>\n<p>LTD63&amp;LTD50 hoist working principle: The working wire rope shows the shape of \u201c\u03b1\u201d twisting in the \u201cV\u201dshape groove of the grooved internal gear. Make the hoist up and down along the working wire rope relying on the friction between the two sides of \u201cV\u201d shape groove.<\/p>\n<p>LTD80 hoist working principle: The working wire rope shows the shape of \u201cS\u201d twisting in the \u201cV\u201dshape groove of the grooved internal gear.<\/p>\n<h3>Product Parameters<\/h3>\n<hr \/>\n<table style=\"height: 244px;\" border=\"1\" width=\"647\">\n<tbody>\n<tr>\n<td style=\"width: 367.333px;\"><span data-spm-anchor-id=\"a2700.details.pronpeci14.i3.19837e6aVEprJg\">Model Number<\/span><\/td>\n<td style=\"width: 83.8833px;\">LTD80<\/td>\n<td style=\"width: 83.9px;\">LTD63<\/td>\n<td style=\"width: 83.8833px;\">LTD50<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 367.333px;\" data-spm-anchor-id=\"a2700.details.pronpeci14.i2.19837e6aVEprJg\">Rated Lifting Capacity(KN)<\/td>\n<td style=\"width: 83.8833px;\">8<\/td>\n<td style=\"width: 83.9px;\">6.3<\/td>\n<td style=\"width: 83.8833px;\">5<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 367.333px;\">Lifting Speed(m\/min)<\/td>\n<td style=\"width: 83.8833px;\">8.3<\/td>\n<td style=\"width: 83.9px;\">9.0<\/td>\n<td style=\"width: 83.8833px;\">9.0<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 367.333px;\" data-spm-anchor-id=\"a2700.details.pronpeci14.i1.19837e6aVEprJg\">Weight(kg)<\/td>\n<td style=\"width: 83.8833px;\">50<\/td>\n<td style=\"width: 83.9px;\">46<\/td>\n<td style=\"width: 83.8833px;\">41<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 367.333px;\">Power(KW)<\/td>\n<td style=\"width: 83.8833px;\">2.2<\/td>\n<td style=\"width: 83.9px;\">1.5<\/td>\n<td style=\"width: 83.8833px;\">1.1<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 367.333px;\">Voltage(V)<\/td>\n<td style=\"width: 83.8833px;\">380<\/td>\n<td style=\"width: 83.9px;\">380<\/td>\n<td style=\"width: 83.8833px;\">380<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 367.333px;\">Steel wire rope diameter(mm)<\/td>\n<td style=\"width: 83.8833px;\">8.6<\/td>\n<td style=\"width: 83.9px;\">8.3<\/td>\n<td style=\"width: 83.8833px;\">\u00a08.3<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<table style=\"height: 99px;\" border=\"1\" width=\"655\">\n<tbody>\n<tr>\n<td style=\"width: 88.3333px;\"><span data-spm-anchor-id=\"a2700.details.pronpeci14.i5.19837e6aVEprJg\">Motor<\/span><\/td>\n<td style=\"width: 300.433px;\">Hz(Hz)<\/td>\n<td style=\"width: 77.4167px;\">50<\/td>\n<td style=\"width: 77.4167px;\">50<\/td>\n<td style=\"width: 77.4px;\">50<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 88.3333px;\"><\/td>\n<td style=\"width: 300.433px;\">Braking torque(N.m)<\/td>\n<td style=\"width: 77.4167px;\">15.2<\/td>\n<td style=\"width: 77.4167px;\">15.2<\/td>\n<td style=\"width: 77.4px;\">15.2<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 88.3333px;\" data-spm-anchor-id=\"a2700.details.pronpeci14.i4.19837e6aVEprJg\"><\/td>\n<td style=\"width: 300.433px;\">Speed(r\/min)<\/td>\n<td style=\"width: 77.4167px;\">1420<\/td>\n<td style=\"width: 77.4167px;\">1400<\/td>\n<td style=\"width: 77.4px;\">1400<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u0627\u0644\u062a\u0639\u0644\u064a\u0645\u0627\u062a<\/p>\n<p>1. Q: Are you a manufacturer or trading company?<\/p>\n<p>A: We are manufacturer with many years production experience.<\/p>\n<p>2. Q: What kind of payment term do you accept?<\/p>\n<p>A: We accept both TT and LC.<\/p>\n<p>3. Q: What steel material do you use during production?<\/p>\n<p>A: Steel Q195, Q235,Q345.<\/p>\n<p>4. Q: How do you guarantee the quality of products?<\/p>\n<p>All products are made of high quality materials from trusted vendors.<br \/>\nAll products must go through strict tests in the process of manufacturing.<br \/>\nStrict inspection will be done by our QC before delivery.<\/p>\n<p>5. Q: How is the bearing capacity of your scaffolding?<\/p>\n<p>A: It depends on which kind of scaffolding, sizes, and your setup. All our scaffoldings and accessories pass necessory tests.<\/p>\n<p>6. Q: How high can your scaffolding reach to?<\/p>\n<p>A: Normally, we suggest to setup the scaffolding maximum to 30 meters. But some of our customers setup our scaffolding reach to 60 meters. According to safety documents, we need to setup a steel platform every 20 meters where the scaffolding can be setup continually.<\/p>\n<p>7. Q: How is the life span of your scaffolding?<\/p>\n<p>A: It depends on how you use it and how you store it. Normally, the life span of our scaffolding is 5-7 years.<\/p>\n<h3>\nQuick Details<\/h3>\n<hr \/>\n<p>Condition: New<br \/>\nPlace of Origin: shanghai, China (Mainland)<br \/>\nBrand Name: success<br \/>\nModel Number: HX-064<br \/>\nUsage: Suspended platform<br \/>\nPower Source:Electric<br \/>\nSling Type: Wire Rope<br \/>\nMaximum Lifting Weight: 1000kg<br \/>\nMaximum Lifting Height: 120m<br \/>\nLift Speed: Control<br \/>\nCertification: CE ISO, ISO9001<br \/>\nWarranty: 1 Year, 1 Year<br \/>\nAfter-sales Service Provided: Engineers available to service machinery overseas<br \/>\nApplication: Suspended platform<br \/>\nMaterial: Aluminium magnesium alloy<br \/>\nType: Suspended Working Platform Equipment<br \/>\nProduct Name: Platform lifting hoist<br \/>\nStandard: JIS<br \/>\nKeyword: High Altitude Working<br \/>\nColor: Customer Required<br \/>\nModel: LTD<\/p>\n<h2>Custom Hoist Data<\/h2>\n<p>Confirm the exact model, nameplate data, dimensions and intended application before ordering or installation. Safety-critical components must be matched to the approved complete system.<\/p>\n<h2>Ordering Information<\/h2>\n<ul>\n<li>Equipment model and clear nameplate photos<\/li>\n<li>Required load, dimensions and working height<\/li>\n<li>Voltage, phase and frequency<\/li>\n<li>Existing component and mounting details<\/li>\n<\/ul>\n<p>Browse <a href=\"https:\/\/www.buildinglift.com\/product-category\/suspended-platform\/\">suspended platform systems<\/a>, review <a href=\"https:\/\/www.buildinglift.com\/suspended-platform-spare-parts-2\/\">spare parts<\/a>, or <a href=\"https:\/\/www.buildinglift.com\/contact-us\/\">request a compatibility check<\/a>. Follow the manufacturer\u2019s instructions and applicable work-at-height controls.<\/p>\n<p>For site planning, also review the applicable local rules and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>Custom Suspended Platform Lifting Hoist. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":792,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[160],"tags":[35,32],"class_list":["post-790","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-buy-suspended-platform-spare-parts-supplier","tag-suspended-platform-china","tag-suspended-working-platform-manufacturer"],"_links":{"self":[{"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/posts\/790","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/comments?post=790"}],"version-history":[{"count":3,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/posts\/790\/revisions"}],"predecessor-version":[{"id":7203,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/posts\/790\/revisions\/7203"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/media\/792"}],"wp:attachment":[{"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/media?parent=790"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/categories?post=790"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/tags?post=790"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}