{"id":1187,"date":"2018-08-27T07:32:33","date_gmt":"2018-08-27T07:32:33","guid":{"rendered":"http:\/\/www.buildinglift.com\/?p=1187"},"modified":"2026-06-19T04:53:31","modified_gmt":"2026-06-19T12:53:31","slug":"%d8%b9%d9%84%d9%82%d8%aa-%d8%b2%d9%84%d8%a8-630-%d9%87%d9%88%d8%a7%d8%a6%d9%8a%d8%a9-%d8%a7%d9%84%d9%84%d9%88%d8%ad%d8%a9-%d8%a7%d9%84%d8%b9%d9%85%d9%84-%d9%85%d9%86%d8%b5%d8%a9-%d8%a7%d9%84%d9%86","status":"publish","type":"post","link":"https:\/\/www.buildinglift.com\/ar\/%d8%b9%d9%84%d9%82%d8%aa-%d8%b2%d9%84%d8%a8-630-%d9%87%d9%88%d8%a7%d8%a6%d9%8a%d8%a9-%d8%a7%d9%84%d9%84%d9%88%d8%ad%d8%a9-%d8%a7%d9%84%d8%b9%d9%85%d9%84-%d9%85%d9%86%d8%b5%d8%a9-%d8%a7%d9%84%d9%86\/","title":{"rendered":"ZLP630 Platform for Painting and Window Cleaning"},"content":{"rendered":"<h2>ZLP630 Platform for Painting and Window Cleaning<\/h2>\n<p><strong>ZLP630 Platform for Painting and Window Cleaning<\/strong> is the exact configuration covered on this page. Confirm the complete system against the rated load, electrical supply and site conditions.<\/p>\n<p>ZLP630 painting platform for exterior coating, window cleaning and facade maintenance. The final configuration must be verified against the working load, building geometry and destination power supply.<\/p>\n<p><iframe src=\"https:\/\/www.youtube.com\/embed\/4U-Dk1aH3_E?rel=0&amp;controls=0\" width=\"560\" height=\"315\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\"><\/iframe><br \/>\n<strong>Working Principle:<\/strong><\/p>\n<p>The platform is driven by electric hoist and wire rope, running against the building facade while the suspension mechanism was erected on buildings or structures.<\/p>\n<p><strong>Usage and Application:<\/strong><\/p>\n<p>ZLP series Suspended Platform belongs to high-rise working construction machinery, mainly used to install curtain wall, facade cleaning or other works such as plaster pulp, veneer, paint coatings, oil paint, or cleaning and maintenance, etc., can also be used for large tanks, bridges, dams and other construction operations.<\/p>\n<p>Above all, HUIYANG Platform can increase the efficiency greatly, with simple and flexible operation, easy transfer, convenient and practical, safe and reliable.<\/p>\n<table class=\"aliDataTable\">\n<tbody>\n<tr>\n<td colspan=\"4\">\n<div>\n<div align=\"center\" data-spm-anchor-id=\"a2700.details.pronpeci14.i1.30ae7008oFAIbz\"><b><span style=\"font-size: large;\">The Parameters of ZLP series Suspended Platform<\/span><\/b><\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"left\">\u00a0\u00a0 \u00a0\u00a0 Type<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">ZLP500<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">ZLP630<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">ZLP800<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"left\">1.\u00a0\u00a0 Rated Load<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">500kg<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">630kg<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">800 \u0643\u062c\u0645<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"left\">2.\u00a0 \u00a0Lifting speed<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">9.3m\/min<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">9.3m\/min<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">9.3m\/min<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>3.\u00a0 \u00a0Lifting height<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">100m<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">100m<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">100m<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>4.\u00a0\u00a0 Hoist<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">\u0627\u0644\u0645\u062d\u062f\u0648\u062f\u0629 6.3<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">\u0627\u0644\u0645\u062d\u062f\u0648\u062f\u0629 6.3<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">\u0627\u0644\u0645\u062d\u062f\u0648\u062f\u0629 8.0<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"left\">4.1 Voltage-3 Phase<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">380V(415V\/220V)<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">380V(415V\/220V)<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">380V(415V\/220V)<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"left\">4.2 Frequency<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">50Hz\/60Hz<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">50Hz\/60Hz<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">50Hz\/60Hz<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"left\">4.3\u00a0Power<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">1.5kwx2<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">1.5kwx2<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">1.8kwx2<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"left\">5.\u00a0\u00a0 Safety Lock<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">LSG20<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">LSG20<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">LSG30<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div>6.\u00a0\u00a0 Electric Control<\/div>\n<div>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Cabinet Components<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">Schneider or CHNT<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">Schneider or CHNT<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">Schneider or CHNT<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>7.\u00a0\u00a0 Platform Sise (LxWxH)<\/div>\n<\/td>\n<td>\n<div>(2.5+2.5)x0.69&#215;1.42m<\/div>\n<\/td>\n<td>\n<div>(2+2+2)x0.69&#215;1.42m<\/div>\n<\/td>\n<td>\n<div>(2.5+2.5+2.5)x0.69&#215;1.42m<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"left\"><\/div>\n<div align=\"left\">8.\u00a0\u00a0 Steel\u00a0Wire Rope<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">4pcsx100m<\/div>\n<div align=\"center\">4x31SW+FC D=8.3mm<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">4pcsx100m<br \/>\n4x31SW+FC D=8.3mm<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">4pcsx100m<br \/>\n4x31SW+FC D=9.1mm<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>9.\u00a0\u00a0 Special Cable<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">(3&#215;2.0+2&#215;1.0mm2)\u00a0 100m<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">(3&#215;2.0+2&#215;1.0mm2\u00a0) 100m<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">(3&#215;2.5+2&#215;1.5mm2)\u00a0 100m<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"left\">10. Suspended Jibs<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">340kg<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">340kg<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">340kg<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"center\">Lifting\u00a0 Parts Weight<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">410kg(Steel)<br \/>\n290kg(Aluminum)<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">480kg(Steel)<br \/>\n340kg(Aluminum)<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">530kg(Steel)<br \/>\n380kg(Aluminum)<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"center\">Counter Weight<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">750kg<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">900 \u0643\u062c\u0645<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">1000 \u0643\u062c\u0645<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<div>\n<div align=\"center\">Qty of 20&#8243; Container<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">13 sets<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">13 sets<\/div>\n<\/div>\n<\/td>\n<td>\n<div>\n<div align=\"center\">10 sets<\/div>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><strong>1. Working Platform: Steel + Painting;<\/strong> ( Steel+Galvanised or Aluminum Alloy+Painting is available also)<\/p>\n<p>1.1 Working Platform is the workplace at heights for the workers.<br \/>\n1.2 Size of platform can be adjusted from 1.0m, 1.5m, 2m, 2.5 meter or 3m etc depending upon the needs of your building<br \/>\n1.3 With caster wheel fitted underneath, the platform is easy to move.<\/p>\n<p><strong>2. Suspension Mechanism:<\/strong> Surface with Painting or Hot-dipped Galvanized<br \/>\nSuspension mechanism is on the top of the building to suspend the platforms through the steel rope.<\/p>\n<p><strong>3. Components:<\/strong><br \/>\nLTD6.3 Hoist, 1.5kw, 2 sets;<br \/>\nLSG20 Safety Lock, 2 sets;<br \/>\nElectric Cabine: 1 set;<br \/>\nSteel Rope: 4pcs, 100m\/pcs; D=8.3mm;<br \/>\nElectric Cable: 1pcs, 100m\/pcs, Rubber, 3&#215;2.0+2&#215;1.0mm sq;<br \/>\nSafety Rope: 1pcs; 100m\/pcs; Nylon;<br \/>\nCounterweight (Optional): 40pcs, 25kg\/pcs.<\/p>\n<h2>Configuration and Ordering Notes<\/h2>\n<p>Confirm platform length, material, hoist model, safety locks, wire ropes, controls and suspension mechanism as a complete approved system. Include workers, tools and materials in the load calculation.<\/p>\n<ul>\n<li>Building height and facade dimensions<\/li>\n<li>Required load and platform arrangement<\/li>\n<li>Voltage, phase and frequency<\/li>\n<li>Roof and parapet conditions<\/li>\n<\/ul>\n<p>Compare <a href=\"https:\/\/www.buildinglift.com\/product-category\/suspended-platform\/\">suspended platform products<\/a>, review <a href=\"https:\/\/www.buildinglift.com\/suspended-platform-spare-parts-2\/\">replacement components<\/a>, or <a href=\"https:\/\/www.buildinglift.com\/contact-us\/\">request project selection support<\/a>.<\/p>\n<p>For site planning, also review the applicable local rules and the <a href=\"https:\/\/www.osha.gov\/laws-regs\/regulations\/standardnumber\/1926\/1926.451\" target=\"_blank\" rel=\"noopener\">OSHA suspended scaffold requirements<\/a>.<\/p>","protected":false},"excerpt":{"rendered":"<p>ZLP630 Platform for Painting and Window Cleaning. Review specifications, applications, configuration options and project information required before ordering.<\/p>","protected":false},"author":1,"featured_media":1188,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[36],"class_list":["post-1187","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-suspended-working-platform","tag-window-cleaning-suspended-platform"],"_links":{"self":[{"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/posts\/1187","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/comments?post=1187"}],"version-history":[{"count":4,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/posts\/1187\/revisions"}],"predecessor-version":[{"id":7269,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/posts\/1187\/revisions\/7269"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/media\/1188"}],"wp:attachment":[{"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/media?parent=1187"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/categories?post=1187"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.buildinglift.com\/ar\/wp-json\/wp\/v2\/tags?post=1187"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}